Vital Resources
Woodlands House
16 Deanston Gardens
Doune, Perthshire
FK16 6AZ

Tel: +44 (0)1786 841 184

Designed & Hosted
by Calinet

© Copyright 2009
 
 

Drinks

Team Based Working

Client Case Study

Multi site bottling operation
employing 600 personnel

The Problem

• Need to reduce operating costs
• Low customer satisfaction
• Under utilisation of technical skills
• High inventory
• High material wastage
• Low morale
• Poor cooperation

After Vital Resources facilitated
Teambased Working


• Headcount reduced by 20%
• Cost per case reduced by 5%
• Non conformance improved from 5% to 0.2%
30% reduction in material wastage
• Line efficiency increased by 15%
• Material quality increased
• Vehicle to introduce TPM/RCM
• Integrated Operations and engineering

 
 
 
 


Dunalastair Hotel



 
 
 
 

Home | Team Based Working | Strategic Development | Leadership Development
Executive Coaching | Stress & Performance | Change Management | Performance Management | Management Assessment | Interactive Conferences | Activity Days
Join the Team | Contact Us | Oil | Drinks | Education | Manufacturing | Electronics
Site Map
c